GUNPOWDER ROAD over GUNPOWDER FALLS

Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:GUNPOWDER ROAD over GUNPOWDER FALLS
Structure number:200000BC6517010
Location:2.3 MI S MARY-PENN ST LIN
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:56.1 ft. [17.1 m]
Total length:173.9 ft. [53.0 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:35.1 ft. [10.7 m]
Skew angle:45°
Owner:City or Municipal Highway Agency [04]
Year built:1968
Year reconstructed:1990
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:125 [as of 2007]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:63.4 tons [57.6 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Sufficiency rating:93.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$56,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:100 [as of 1994]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:94.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$32,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:100 [as of 1981]
Deck condition:Excellent [9 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge not over waterway. [N]
Operating rating:63.4 tons [57.6 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Sufficiency rating:92.0