MONROE ST RAMP EB over SERVICE ROAD
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | MONROE ST RAMP EB over SERVICE ROAD |
| Structure number: | 200000BC8003010 |
| Location: | 1 MI S OF RTE 1 |
| Purpose: | Carries highway over highway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 60.0 ft. [18.3 m] |
| Total length: | 141.1 ft. [43.0 m] |
| Roadway width between curbs: | 25.9 ft. [7.9 m] |
| Deck width edge-to-edge: | 28.9 ft. [8.8 m] |
| Vertical clearance below bridge: | 14.4 ft. [4.4 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1963 |
| Year reconstructed: | 2006 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 22.5 / HS 25 [9] |
| Number of main spans: | 3 |
| Main spans material: | Concrete [1] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 13,300 [as of 2007] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Excellent [9 out of 9] |
| Substructure condition: | Excellent [9 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Sufficiency rating: | 96.1 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $273,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 11,684 [as of 1994] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 72.3 tons [65.7 metric tons] |
| Inventory rating: | 43.6 tons [39.6 metric tons] |
| Sufficiency rating: | 85.1 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $81,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 11,684 [as of 1988] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 72.3 tons [65.7 metric tons] |
| Inventory rating: | 43.6 tons [39.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 94.2 |