Share:

MONROE ST RAMP EB over SERVICE ROAD

Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:MONROE ST RAMP EB over SERVICE ROAD
Structure number:200000BC8003010
Location:1 MI S OF RTE 1
Purpose:Carries highway over highway
Route classification:Local (Urban) [19]
Length of largest span:60.0 ft. [18.3 m]
Total length:141.1 ft. [43.0 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:28.9 ft. [8.8 m]
Vertical clearance below bridge:14.4 ft. [4.4 m]
Owner:City or Municipal Highway Agency [04]
Year built:1963
Year reconstructed:2006
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,300 [as of 2007]
Truck traffic:8% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Excellent [9 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:96.1
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$273,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,684 [as of 1994]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:72.3 tons [65.7 metric tons]
Inventory rating:43.6 tons [39.6 metric tons]
Sufficiency rating:85.1
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$81,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,684 [as of 1988]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:72.3 tons [65.7 metric tons]
Inventory rating:43.6 tons [39.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:94.2