FORT AVE over CSX
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | FORT AVE over CSX |
| Structure number: | 200000BC8022010 |
| Location: | FORT AVENUE OVER CSX RR |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 34.1 ft. [10.4 m] |
| Total length: | 105.0 ft. [32.0 m] |
| Roadway width between curbs: | 49.5 ft. [15.1 m] |
| Deck width edge-to-edge: | 82.4 ft. [25.1 m] |
| Vertical clearance below bridge: | 18.0 ft. [5.5 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1920 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Number of main spans: | 3 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 11,300 [as of 2007] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Serious [3 out of 9] |
| Superstructure condition: | Serious [3 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 30.7 tons [27.9 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 36.1 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $1,751,000 |
2000 Inspection
| Status: | Open, posting recommended but not legally implemented [B] |
| Average daily traffic: | 9,839 [as of 1994] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Critical [2 out of 9] |
| Superstructure condition: | Critical [2 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 30.7 tons [27.9 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 20.5 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $580,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 9,839 [as of 1988] |
| Deck condition: | Serious [3 out of 9] |
| Superstructure condition: | Serious [3 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 71.3 tons [64.8 metric tons] |
| Inventory rating: | 42.6 tons [38.7 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 20.9 |