Share:

FORT AVE over CSX

Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FORT AVE over CSX
Structure number:200000BC8022010
Location:FORT AVENUE OVER CSX RR
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Local (Urban) [19]
Length of largest span:34.1 ft. [10.4 m]
Total length:105.0 ft. [32.0 m]
Roadway width between curbs:49.5 ft. [15.1 m]
Deck width edge-to-edge:82.4 ft. [25.1 m]
Vertical clearance below bridge:18.0 ft. [5.5 m]
Owner:City or Municipal Highway Agency [04]
Year built:1920
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:11,300 [as of 2007]
Truck traffic:5% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Poor [4 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.4 tons [54.0 metric tons]
Inventory rating:30.7 tons [27.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:36.1
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,751,000

2000 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:9,839 [as of 1994]
Truck traffic:5% of total traffic
Deck condition:Critical [2 out of 9]
Superstructure condition:Critical [2 out of 9]
Substructure condition:Poor [4 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.4 tons [54.0 metric tons]
Inventory rating:30.7 tons [27.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:20.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$580,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,839 [as of 1988]
Deck condition:Serious [3 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:71.3 tons [64.8 metric tons]
Inventory rating:42.6 tons [38.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:20.9