SUNDOWN ROAD over HAWLINGS RIVER
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | SUNDOWN ROAD over HAWLINGS RIVER |
| Structure number: | 200000M-0122010 |
| Location: | 2.0 MI E OF JCT SR 108 |
| Purpose: | Carries highway over waterway |
| Route classification: | Minor Collector (Rural) [08] |
| Length of largest span: | 49.9 ft. [15.2 m] |
| Total length: | 55.1 ft. [16.8 m] |
| Roadway width between curbs: | 29.9 ft. [9.1 m] |
| Deck width edge-to-edge: | 33.1 ft. [10.1 m] |
| Skew angle: | 10° |
| Owner: | County Highway Agency [02] |
| Year built: | 1996 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Steel [3] |
| Main span design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Integral Concrete (separate non-modified layer of concrete added to structural deck) [2] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 5,300 [as of 2002] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Countermeasures have been installed to mitigate an existing problem with scour. [7] |
| Operating rating: | 80.2 tons [72.9 metric tons] |
| Inventory rating: | 47.5 tons [43.2 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 77.5 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 4,000 [as of 1994] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 80.2 tons [72.9 metric tons] |
| Inventory rating: | 47.5 tons [43.2 metric tons] |
| Sufficiency rating: | 80.6 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $6,000 |
1992 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 1,742 [as of 1988] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 5.0 tons [4.5 metric tons] |
| Inventory rating: | 4.0 tons [3.6 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 24.7 |