Facts 

Name:IS 95 NB over B & O RR
Structure number:300000BCW598011
Location:MILEPOST 59.8
Purpose:Carries highway over railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:142.1 ft. [43.3 m]
Total length:398.0 ft. [121.3 m]
Roadway width between curbs:58.7 ft. [17.9 m]
Deck width edge-to-edge:62.0 ft. [18.9 m]
Vertical clearance below bridge:16.7 ft. [5.1 m]
Skew angle:27°
Owner:State Toll Authority [31]
Year built:1972
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:84,500 [as of 2006]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:73.3 tons [66.6 metric tons]
Inventory rating:25.7 tons [23.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:63.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,257,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:84,500 [as of 1994]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:73.3 tons [66.6 metric tons]
Inventory rating:25.7 tons [23.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,257,000