I-395 RAMP G over MIDDLE BRANCH
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-395 RAMP G over MIDDLE BRANCH |
| Structure number: | 300000BCWT08012 |
| Location: | Milepost 0.8 |
| Purpose: | Carries highway over railroad and waterway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 185.0 ft. [56.4 m] |
| Total length: | 2423.0 ft. [738.5 m] |
| Roadway width between curbs: | 41.3 ft. [12.6 m] |
| Deck width edge-to-edge: | 44.6 ft. [13.6 m] |
| Vertical clearance above deck: | 23.0 ft. [7.0 m] |
| Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
| Owner: | State Toll Authority [31] |
| Year built: | 1976 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 16 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 78,800 [as of 2006] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge is scour critical; bridge foundations determined to be unstable. [3] |
| Operating rating: | 84.2 tons [76.5 metric tons] |
| Inventory rating: | 37.6 tons [34.2 metric tons] |
| Sufficiency rating: | 86.9 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 78,800 [as of 1994] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge is scour critical; bridge foundations determined to be unstable. [3] |
| Operating rating: | 84.2 tons [76.5 metric tons] |
| Inventory rating: | 37.6 tons [34.2 metric tons] |
| Sufficiency rating: | 86.9 |