Share:

I-895 NB over MOORES RUN

Map 

Coordinates:
+39.31756, -76.53525
39°19'03" N, 76°32'07" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-895 NB over MOORES RUN
Structure number:300000BCY147012
Location:Milepost M14.7
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Tolls:Yes, on toll road [2]
Length of largest span:274.9 ft. [83.8 m]
Total length:470.2 ft. [143.3 m]
Roadway width between curbs:49.9 ft. [15.2 m]
Deck width edge-to-edge:54.1 ft. [16.5 m]
Owner:State Toll Authority [31]
Year built:2008
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:6
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,563 [as of 2001]
Truck traffic:8% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:80.2 tons [72.9 metric tons]
Inventory rating:47.5 tons [43.2 metric tons]
Sufficiency rating:95.3

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,200
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:57.4 tons [52.2 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:96.6