Facts 

Name:ROUTE 27 over TOWNSEND GUT/ATLANTIC O
Structure number:2789
Location:0.1 MI N OF JCT RTE 238
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:88.9 ft. [27.1 m]
Total length:374.0 ft. [114.0 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:23.0 ft. [7.0 m]
Vertical clearance above deck:15.1 ft. [4.6 m]
Vertical clearance below bridge:5.9 ft. [1.8 m]
Owner:State Highway Agency [01]
Year built:1939
Year reconstructed:1987
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 18 / H 20 [4]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Movable - Swing [17]
Deck type:Open Grating [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,054 [as of 2009]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge over "tidal" waters that has not been evaluated for scour, but considered low risk. [T]
Operating rating:36.0 tons [32.7 metric tons]
Inventory rating:25.0 tons [22.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:44.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$5,409,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,639 [as of 1999]
Truck traffic:9% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge over "tidal" waters that has not been evaluated for scour, but considered low risk. [T]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:42.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$4,205,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,370 [as of 1991]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:38.4 tons [34.9 metric tons]
Inventory rating:26.0 tons [23.6 metric tons]
Sufficiency rating:50.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,208,000