I-75, INT'L BRIDGE over ST MARY RIV/PORTAGE AV W
Map
Coordinates:
+46.50845, -84.3605246°30'30" N, 84°21'38" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-75, INT'L BRIDGE over ST MARY RIV/PORTAGE AV W |
| Structure number: | 17117034000B010 |
| Location: | IN SAULT STE MARIE |
| Purpose: | Carries highway over highway, waterway, and railroad |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Tolls: | Yes [1] |
| Length of largest span: | 430.1 ft. [131.1 m] |
| Total length: | 9280.6 ft. [2828.6 m] |
| Roadway width between curbs: | 27.9 ft. [8.5 m] |
| Deck width edge-to-edge: | 34.5 ft. [10.5 m] |
| Vertical clearance above deck: | 18.0 ft. [5.5 m] |
| Vertical clearance below bridge: | 124.0 ft. [37.8 m] |
| Owner: | State Toll Authority [31] |
| Year built: | 1962 |
| Historic significance: | Bridge is on the National Register of Historic Places [1] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 8 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Truss - Thru [10] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Low slump Concrete [4] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 5,242 [as of 2007] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 36.0 tons [32.7 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 57.0 |
| Recommended work: | Bridge deck rehabilitation with only incidental widening. [36] |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 8,900 [as of 1995] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Pier/abutment protection: | In place and functioning [2] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 36.0 tons [32.7 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 54.0 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 9,010 [as of 1990] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Pier/abutment protection: | In place and functioning [2] |
| Operating rating: | 76.2 tons [69.3 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 52.0 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $3,464,000 |