Share:

WARREN AVE over I-94

Map 

Coordinates:
+42.34470, -83.11292
42°20'41" N, 83°06'47" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WARREN AVE over I-94
Structure number:82182023000S110
Location:IN DETROIT
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:91.9 ft. [28.0 m]
Total length:289.1 ft. [88.1 m]
Roadway width between curbs:76.1 ft. [23.2 m]
Deck width edge-to-edge:101.7 ft. [31.0 m]
Vertical clearance below bridge:13.8 ft. [4.2 m]
Skew angle:48°
Owner:State Highway Agency [01]
Year built:1953
Year reconstructed:1997
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:5
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:95,060
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:108.9 tons [99.0 metric tons]
Inventory rating:64.9 tons [59.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.1

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:95,060 [as of 1978]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:108.9 tons [99.0 metric tons]
Inventory rating:64.9 tons [59.0 metric tons]
Sufficiency rating:76.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:95,060 [as of 1978]
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:39.6 tons [36.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:51.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$352,000