SB W GRAND BLVD over I-94

Map 

Coordinates:
+42.34661, -83.10941
42°20'48" N, 83°06'34" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SB W GRAND BLVD over I-94
Structure number:82182023000S130
Location:IN DETROIT
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:76.8 ft. [23.4 m]
Total length:242.8 ft. [74.0 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:56.8 ft. [17.3 m]
Vertical clearance below bridge:14.1 ft. [4.3 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1953
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:5
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,640
Truck traffic:1% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:73.5 tons [66.8 metric tons]
Inventory rating:44.1 tons [40.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:42.4
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$59,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,640 [as of 1978]
Truck traffic:1% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Serious [3 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:47.0 tons [42.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:23.3
Recommended work:Bridge deck replacement with only incidental widening. [37]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,640 [as of 1978]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:46.5 tons [42.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:46.6
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$59,000