Share:

NOTTINGHAM RD over I-94

Map 

Coordinates:
+42.40676, -82.95395
42°24'24" N, 82°57'14" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:NOTTINGHAM RD over I-94
Structure number:82182025000S100
Location:IN DETROIT
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:54.8 ft. [16.7 m]
Total length:165.0 ft. [50.3 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:62.0 ft. [18.9 m]
Vertical clearance below bridge:14.1 ft. [4.3 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1958
Year reconstructed:2000
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:90.0 tons [81.8 metric tons]
Inventory rating:44.0 tons [40.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:94.0

2000 Inspection 

Status:Open, no restriction [A]
Deck condition:Serious [3 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:90.0 tons [81.8 metric tons]
Inventory rating:44.0 tons [40.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:64.0
Recommended work:Bridge deck replacement with only incidental widening. [37]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:600 [as of 1974]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:43.6 tons [39.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:65.9
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$71,000