Share:

GODDARD AVENUE over M-8

Map 

Coordinates:
+42.41077, -83.07283
42°24'39" N, 83°04'22" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:GODDARD AVENUE over M-8
Structure number:82182104000S080
Location:IN DETROIT
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:130.9 ft. [39.9 m]
Total length:216.5 ft. [66.0 m]
Roadway width between curbs:37.1 ft. [11.3 m]
Deck width edge-to-edge:59.4 ft. [18.1 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:12°
Owner:State Highway Agency [01]
Year built:1971
Year reconstructed:2009
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,500 [as of 1990]
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:49.0 tons [44.5 metric tons]
Sufficiency rating:63.6

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,500 [as of 1990]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:49.0 tons [44.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.5

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:530 [as of 1970]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:48.5 tons [44.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:83.6