Facts 

Name:M-8 WB DAVISON over M-10 SB
Structure number:82182112000S150
Location:IN DETROIT
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:74.8 ft. [22.8 m]
Total length:212.9 ft. [64.9 m]
Roadway width between curbs:44.3 ft. [13.5 m]
Deck width edge-to-edge:47.9 ft. [14.6 m]
Vertical clearance below bridge:17.1 ft. [5.2 m]
Skew angle:16°
Owner:State Highway Agency [01]
Year built:1956
Year reconstructed:1996
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:39,515 [as of 2007]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:97.0 tons [88.2 metric tons]
Inventory rating:58.2 tons [52.9 metric tons]
Sufficiency rating:96.3

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:42,500 [as of 1995]
Truck traffic:3% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:97.0 tons [88.2 metric tons]
Inventory rating:58.2 tons [52.9 metric tons]
Sufficiency rating:93.9

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,840 [as of 1982]
Deck condition:Fair [5 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:39.6 tons [36.0 metric tons]
Sufficiency rating:78.3
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$186,000