Share:

DEXTER-BELDEN AVE. over M-10 JOHN LODGE FRWY

Map 

Coordinates:
+42.40489, -83.13555
42°24'18" N, 83°08'08" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:DEXTER-BELDEN AVE. over M-10 JOHN LODGE FRWY
Structure number:82182112000S200
Location:IN DETROIT
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:58.1 ft. [17.7 m]
Total length:172.9 ft. [52.7 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:67.9 ft. [20.7 m]
Vertical clearance below bridge:14.1 ft. [4.3 m]
Skew angle:11°
Owner:State Highway Agency [01]
Year built:1955
Year reconstructed:1994
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,310
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:92.0 tons [83.6 metric tons]
Inventory rating:45.0 tons [40.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.6

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,310 [as of 1978]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Poor [4 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:92.0 tons [83.6 metric tons]
Inventory rating:45.0 tons [40.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:47.5
Recommended work:Bridge deck replacement with only incidental widening. [37]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,310 [as of 1978]
Deck condition:Poor [4 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:44.6 tons [40.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:72.4
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$188,000