Share:

GLENDALE AVE over I-96

Map 

Coordinates:
+42.38209, -83.23899
42°22'56" N, 83°14'20" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:GLENDALE AVE over I-96
Structure number:82182122000S240
Location:IN DETROIT
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:65.0 ft. [19.8 m]
Total length:253.0 ft. [77.1 m]
Roadway width between curbs:28.9 ft. [8.8 m]
Deck width edge-to-edge:41.7 ft. [12.7 m]
Vertical clearance below bridge:17.4 ft. [5.3 m]
Owner:State Highway Agency [01]
Year built:1970
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,500 [as of 1988]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:50.1 tons [45.5 metric tons]
Sufficiency rating:67.8

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,500 [as of 1988]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:50.1 tons [45.5 metric tons]
Sufficiency rating:79.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,000 [as of 1977]
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:49.5 tons [45.0 metric tons]
Sufficiency rating:78.0
Recommended work:Bridge deck replacement with only incidental widening. [37]