GLENDALE AVE over I-96
Map
Coordinates:
+42.38209, -83.2389942°22'56" N, 83°14'20" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | GLENDALE AVE over I-96 |
| Structure number: | 82182122000S240 |
| Location: | IN DETROIT |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 65.0 ft. [19.8 m] |
| Total length: | 253.0 ft. [77.1 m] |
| Roadway width between curbs: | 28.9 ft. [8.8 m] |
| Deck width edge-to-edge: | 41.7 ft. [12.7 m] |
| Vertical clearance below bridge: | 17.4 ft. [5.3 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1970 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 4 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 5,500 [as of 1988] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 50.1 tons [45.5 metric tons] |
| Sufficiency rating: | 67.8 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 5,500 [as of 1988] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 50.1 tons [45.5 metric tons] |
| Sufficiency rating: | 79.0 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 5,000 [as of 1977] |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 49.5 tons [45.0 metric tons] |
| Sufficiency rating: | 78.0 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $216,000 |