Share:

LIVERNOIS AVE over I-96

Map 

Coordinates:
+42.36717, -83.13873
42°22'02" N, 83°08'19" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:LIVERNOIS AVE over I-96
Structure number:82182123000S300
Location:IN DETROIT
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:99.4 ft. [30.3 m]
Total length:198.8 ft. [60.6 m]
Roadway width between curbs:91.9 ft. [28.0 m]
Deck width edge-to-edge:117.5 ft. [35.8 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:28°
Owner:State Highway Agency [01]
Year built:1972
Year reconstructed:2009
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:46,200 [as of 2008]
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:64.0 tons [58.2 metric tons]
Sufficiency rating:73.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:39,980 [as of 1970]
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:64.0 tons [58.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:39,980 [as of 1970]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:63.4 tons [57.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$495,000