I96WB TO I94WB RMP over I-96 & RAMP

Map 

Coordinates:
+42.35030, -83.09908
42°21'01" N, 83°05'57" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I96WB TO I94WB RMP over I-96 & RAMP
Structure number:82182123000S420
Location:IN DETROIT
Purpose:Carries highway overpass (third level) over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:110.9 ft. [33.8 m]
Total length:756.9 ft. [230.7 m]
Roadway width between curbs:36.7 ft. [11.2 m]
Deck width edge-to-edge:43.0 ft. [13.1 m]
Vertical clearance below bridge:14.4 ft. [4.4 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1971
Year reconstructed:2005
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:10
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,290 [as of 1982]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:53.0 tons [48.2 metric tons]
Sufficiency rating:94.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$455,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,290 [as of 1982]
Truck traffic:3% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:53.0 tons [48.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:79.0
Recommended work:Bridge deck replacement with only incidental widening. [37]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,290 [as of 1982]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:52.5 tons [47.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:82.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$455,000