Share:

M-102 WB over ROUGE RIVER

Map 

Coordinates:
+42.44268, -83.28131
42°26'34" N, 83°16'53" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:M-102 WB over ROUGE RIVER
Structure number:82182141000B020
Location:0.1 MI W OF US-24
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:69.9 ft. [21.3 m]
Total length:69.9 ft. [21.3 m]
Roadway width between curbs:68.9 ft. [21.0 m]
Deck width edge-to-edge:72.5 ft. [22.1 m]
Owner:State Highway Agency [01]
Year built:1987
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Main span material:Prestressed concrete [5]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:25,704 [as of 2007]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inventory rating:41.0 tons [37.3 metric tons]
Sufficiency rating:96.6

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:24,000 [as of 1995]
Truck traffic:2% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inventory rating:41.0 tons [37.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:32.3

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,100 [as of 1982]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Inventory rating:40.6 tons [36.9 metric tons]
Sufficiency rating:95.3