Share:

6 MI RD over M-39

Map 

Coordinates:
+42.41554, -83.21889
42°24'56" N, 83°13'08" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:6 MI RD over M-39
Structure number:82182193000S050
Location:IN DETROIT
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:53.8 ft. [16.4 m]
Total length:108.9 ft. [33.2 m]
Roadway width between curbs:125.0 ft. [38.1 m]
Deck width edge-to-edge:131.9 ft. [40.2 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1962
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,700
Truck traffic:3% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:92.3 tons [83.9 metric tons]
Inventory rating:55.3 tons [50.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:90.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$97,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,700 [as of 1978]
Truck traffic:3% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:92.3 tons [83.9 metric tons]
Inventory rating:55.3 tons [50.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:92.0
Recommended work:Bridge deck replacement with only incidental widening. [37]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,700 [as of 1978]
Deck condition:Fair [5 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:42.6 tons [38.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:94.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$97,000