US-12 over I-75 NB
Map
Coordinates:
+42.33148, -83.0845642°19'53" N, 83°05'04" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | US-12 over I-75 NB |
| Structure number: | 82182194000S190 |
| Location: | IN DETROIT |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 107.0 ft. [32.6 m] |
| Total length: | 229.0 ft. [69.8 m] |
| Roadway width between curbs: | 93.8 ft. [28.6 m] |
| Deck width edge-to-edge: | 113.2 ft. [34.5 m] |
| Vertical clearance below bridge: | 13.8 ft. [4.2 m] |
| Skew angle: | 48° |
| Owner: | State Highway Agency [01] |
| Year built: | 1970 |
| Year reconstructed: | 1998 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 13,147 [as of 2007] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 85.4 tons [77.6 metric tons] |
| Inventory rating: | 50.4 tons [45.8 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 75.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 12,000 [as of 1995] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 76.2 tons [69.3 metric tons] |
| Inventory rating: | 45.5 tons [41.4 metric tons] |
| Sufficiency rating: | 62.0 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 46,100 [as of 1982] |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 22.8 tons [20.7 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 60.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |