14TH ST over I-75
Map
Coordinates:
+42.33253, -83.0771642°19'57" N, 83°04'38" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | 14TH ST over I-75 |
| Structure number: | 82182195000S010 |
| Location: | IN DETROIT |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 67.9 ft. [20.7 m] |
| Total length: | 330.1 ft. [100.6 m] |
| Roadway width between curbs: | 57.7 ft. [17.6 m] |
| Deck width edge-to-edge: | 80.4 ft. [24.5 m] |
| Vertical clearance below bridge: | 15.4 ft. [4.7 m] |
| Skew angle: | 20° |
| Owner: | State Highway Agency [01] |
| Year built: | 1970 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 6 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 15,000 [as of 1991] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 91.0 tons [82.7 metric tons] |
| Inventory rating: | 43.0 tons [39.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 62.6 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 15,000 [as of 1991] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 91.0 tons [82.7 metric tons] |
| Inventory rating: | 43.0 tons [39.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 64.6 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 5,560 [as of 1978] |
| Deck condition: | Serious [3 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 42.6 tons [38.7 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 58.4 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $374,000 |