Share:

12TH ST over I-75

Map 

Coordinates:
+42.33342, -83.07318
42°20'00" N, 83°04'23" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:12TH ST over I-75
Structure number:82182195000S020
Location:IN DETROIT
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:63.0 ft. [19.2 m]
Total length:284.8 ft. [86.8 m]
Roadway width between curbs:73.8 ft. [22.5 m]
Deck width edge-to-edge:88.9 ft. [27.1 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Owner:State Highway Agency [01]
Year built:1970
Year reconstructed:1998
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:6
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,270 [as of 1978]
Truck traffic:3% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:43.0 tons [39.1 metric tons]
Sufficiency rating:92.7

2000 Inspection 

Status:Open, temporary structure in place to carry legal loads [E]
Average daily traffic:9,270 [as of 1978]
Truck traffic:3% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:43.0 tons [39.1 metric tons]
Sufficiency rating:92.6

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,270 [as of 1978]
Deck condition:Poor [4 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:42.6 tons [38.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:93.5
Recommended work:Bridge deck replacement with only incidental widening. [37]