I-75 NB over I-75 SB TO EB RAMP
Map
Coordinates:
+42.34202, -83.0468242°20'31" N, 83°02'49" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-75 NB over I-75 SB TO EB RAMP |
| Structure number: | 82182251000S071 |
| Location: | I-75 & I-375 INTCHG |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 33.8 ft. [10.3 m] |
| Total length: | 33.8 ft. [10.3 m] |
| Roadway width between curbs: | 42.3 ft. [12.9 m] |
| Deck width edge-to-edge: | 45.6 ft. [13.9 m] |
| Vertical clearance below bridge: | 14.8 ft. [4.5 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1970 |
| Year reconstructed: | 1998 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Main span material: | Steel [3] |
| Main span design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 11,374 [as of 2007] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 103.0 tons [93.6 metric tons] |
| Inventory rating: | 61.8 tons [56.2 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 75.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 58,500 [as of 1995] |
| Truck traffic: | 11% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 82.2 tons [74.7 metric tons] |
| Inventory rating: | 49.5 tons [45.0 metric tons] |
| Sufficiency rating: | 63.0 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 32,200 [as of 1982] |
| Truck traffic: | 13% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 61.4 tons [55.8 metric tons] |
| Sufficiency rating: | 90.0 |
| Estimated cost of work: | $110,000 |