Share:

M-3 CONN over I-75 & I-375

Map 

Coordinates:
+42.34327, -83.04400
42°20'36" N, 83°02'38" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:M-3 CONN over I-75 & I-375
Structure number:82182251000S081
Location:IN DETROIT OVER I-375
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:78.7 ft. [24.0 m]
Total length:361.9 ft. [110.3 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:47.2 ft. [14.4 m]
Vertical clearance below bridge:16.1 ft. [4.9 m]
Skew angle:12°
Owner:State Highway Agency [01]
Year built:1964
Year reconstructed:1998
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:7
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,748 [as of 2007]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:83.2 tons [75.6 metric tons]
Inventory rating:49.5 tons [45.0 metric tons]
Sufficiency rating:99.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,480 [as of 1982]
Truck traffic:3% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Serious [3 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:83.2 tons [75.6 metric tons]
Inventory rating:49.5 tons [45.0 metric tons]
Sufficiency rating:42.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,480 [as of 1982]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:40.6 tons [36.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:95.0