M-3 TO I-375 S RMP over I-75
Map
Coordinates:
+42.34483, -83.0443042°20'41" N, 83°02'39" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | M-3 TO I-375 S RMP over I-75 |
| Structure number: | 82182251000S120 |
| Location: | IN DETROIT |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 87.9 ft. [26.8 m] |
| Total length: | 237.2 ft. [72.3 m] |
| Roadway width between curbs: | 27.6 ft. [8.4 m] |
| Deck width edge-to-edge: | 30.8 ft. [9.4 m] |
| Vertical clearance below bridge: | 15.4 ft. [4.7 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1963 |
| Year reconstructed: | 1998 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 4 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 10,110 [as of 1982] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 70.1 tons [63.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 79.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 10,110 [as of 1982] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Excellent [9 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 70.1 tons [63.7 metric tons] |
| Sufficiency rating: | 52.0 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 10,110 [as of 1982] |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 58.4 tons [53.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 93.0 |