Share:

I-94 W-S RAMP over I-75 & RAMP

Map 

Coordinates:
+42.36897, -83.05794
42°22'08" N, 83°03'29" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-94 W-S RAMP over I-75 & RAMP
Structure number:82182251000S290
Location:IN DETROIT
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:67.9 ft. [20.7 m]
Total length:185.7 ft. [56.6 m]
Roadway width between curbs:35.1 ft. [10.7 m]
Deck width edge-to-edge:38.4 ft. [11.7 m]
Vertical clearance below bridge:14.4 ft. [4.4 m]
Skew angle:20°
Owner:State Highway Agency [01]
Year built:1962
Year reconstructed:2002
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,870 [as of 1982]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:45.0 tons [40.9 metric tons]
Inventory rating:45.0 tons [40.9 metric tons]
Sufficiency rating:94.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,870 [as of 1982]
Truck traffic:3% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Serious [3 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:53.9 tons [49.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:47.0
Recommended work:Bridge deck replacement with only incidental widening. [37]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,870 [as of 1982]
Deck condition:Fair [5 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Poor [4 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:40.6 tons [36.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:66.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$31,000