M-102 WB SERV RD over I-75
Map
Coordinates:
+42.44689, -83.0949542°26'49" N, 83°05'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | M-102 WB SERV RD over I-75 |
| Structure number: | 82182252000S108 |
| Location: | IN DETROIT |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 64.0 ft. [19.5 m] |
| Total length: | 127.0 ft. [38.7 m] |
| Roadway width between curbs: | 41.7 ft. [12.7 m] |
| Deck width edge-to-edge: | 54.1 ft. [16.5 m] |
| Vertical clearance below bridge: | 15.1 ft. [4.6 m] |
| Skew angle: | 1° |
| Owner: | State Highway Agency [01] |
| Year built: | 1969 |
| Year reconstructed: | 2007 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 2 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Latex Concrete or similar additive [3] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 14,430 [as of 1982] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 48.0 tons [43.6 metric tons] |
| Sufficiency rating: | 78.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 14,430 [as of 1982] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 48.0 tons [43.6 metric tons] |
| Sufficiency rating: | 78.0 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 14,430 [as of 1982] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 47.5 tons [43.2 metric tons] |
| Sufficiency rating: | 79.0 |
| Estimated cost of work: | $767,000 |