Facts 

Name:I-75 over MCNICHOLS RD
Structure number:82182252000S220
Location:IN DETROIT OVER MCNICHOLS
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:82.0 ft. [25.0 m]
Total length:224.7 ft. [68.5 m]
Roadway width between curbs:142.7 ft. [43.5 m]
Deck width edge-to-edge:149.3 ft. [45.5 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Skew angle:29°
Owner:State Highway Agency [01]
Year built:1969
Year reconstructed:2003
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:4
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:174,074 [as of 2007]
Truck traffic:7% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:36.0 tons [32.7 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:92.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:211,000 [as of 1995]
Truck traffic:6% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Serious [3 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:102.3 tons [93.0 metric tons]
Inventory rating:61.4 tons [55.8 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:52.0
Recommended work:Bridge deck replacement with only incidental widening. [37]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:112,600 [as of 1982]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Inventory rating:47.5 tons [43.2 metric tons]
Sufficiency rating:81.0
Recommended work:Bridge deck replacement with only incidental widening. [37]