TH 62 EB over TH 77
Map
Coordinates:
+44.89557, -93.2470844°53'44" N, 93°14'49" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | TH 62 EB over TH 77 |
| Structure number: | 27022 |
| Location: | AT THE JCT TH 77 & 62 |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 93.8 ft. [28.6 m] |
| Total length: | 183.1 ft. [55.8 m] |
| Roadway width between curbs: | 43.6 ft. [13.3 m] |
| Deck width edge-to-edge: | 46.9 ft. [14.3 m] |
| Vertical clearance below bridge: | 15.7 ft. [4.8 m] |
| Skew angle: | 14° |
| Owner: | State Highway Agency [01] |
| Year built: | 1962 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 2 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Low slump Concrete [4] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 48,500 [as of 2004] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 64.1 tons [58.3 metric tons] |
| Inventory rating: | 38.4 tons [34.9 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 73.0 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $202,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 44,500 [as of 1996] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 63.6 tons [57.8 metric tons] |
| Inventory rating: | 38.2 tons [34.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 73.5 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 39,500 [as of 1990] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 71.1 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $148,000 |