Facts 

Name:TH 62 EB over TH 77
Structure number:27022
Location:AT THE JCT TH 77 & 62
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:93.8 ft. [28.6 m]
Total length:183.1 ft. [55.8 m]
Roadway width between curbs:43.6 ft. [13.3 m]
Deck width edge-to-edge:46.9 ft. [14.3 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Skew angle:14°
Owner:State Highway Agency [01]
Year built:1962
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:48,500 [as of 2004]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.1 tons [58.3 metric tons]
Inventory rating:38.4 tons [34.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.0
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$202,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:44,500 [as of 1996]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:63.6 tons [57.8 metric tons]
Inventory rating:38.2 tons [34.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.5
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:39,500 [as of 1990]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:71.1
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$148,000