Share:

43rd Ave S over TH 62

Map 

Coordinates:
+44.89847, -93.21146
44°53'54" N, 93°12'41" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:43rd Ave S over TH 62
Structure number:27524
Location:1.0 MI W OF JCT TH 55
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Collector (Urban) [17]
Length of largest span:44.9 ft. [13.7 m]
Total length:158.5 ft. [48.3 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:42.3 ft. [12.9 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Owner:State Highway Agency [01]
Year built:1966
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,550 [as of 1986]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.0 tons [53.6 metric tons]
Inventory rating:35.4 tons [32.2 metric tons]
Sufficiency rating:92.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$768,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,550 [as of 1986]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:57.0 tons [51.8 metric tons]
Inventory rating:39.2 tons [35.6 metric tons]
Sufficiency rating:92.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,550 [as of 1986]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:27.7 tons [25.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:57.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$563,000