Share:

I 94 WB on ramp over I 35W & SB on ramp

Map 

Coordinates:
+44.96614, -93.25561
44°57'58" N, 93°15'20" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I 94 WB on ramp over I 35W & SB on ramp
Structure number:27850
Location:At the East Jct TH 94
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:88.9 ft. [27.1 m]
Total length:361.9 ft. [110.3 m]
Roadway width between curbs:36.7 ft. [11.2 m]
Deck width edge-to-edge:40.0 ft. [12.2 m]
Vertical clearance below bridge:22.6 ft. [6.9 m]
Skew angle:39°
Owner:State Highway Agency [01]
Year built:1967
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:5
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,300 [as of 1994]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:63.8 tons [58.0 metric tons]
Inventory rating:38.3 tons [34.8 metric tons]
Sufficiency rating:97.3

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:118,000 [as of 1996]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:63.3 tons [57.5 metric tons]
Inventory rating:38.0 tons [34.5 metric tons]
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,300 [as of 1988]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:70.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,173,000