Share:

TH 55 SB off ramp over I 35W & NB off ramp

Map 

Coordinates:
+44.96756, -93.25369
44°58'03" N, 93°15'13" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:TH 55 SB off ramp over I 35W & NB off ramp
Structure number:27873
Location:0.2 MI NE OF E JCT TH 94
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:97.1 ft. [29.6 m]
Total length:242.5 ft. [73.9 m]
Roadway width between curbs:59.1 ft. [18.0 m]
Deck width edge-to-edge:68.2 ft. [20.8 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:33°
Owner:State Highway Agency [01]
Year built:1970
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,300 [as of 1994]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:65.9 tons [59.9 metric tons]
Inventory rating:39.5 tons [35.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:95.2

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:118,000 [as of 1996]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:65.5 tons [59.5 metric tons]
Inventory rating:39.2 tons [35.6 metric tons]
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,300 [as of 1988]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:95.4