GROVELAND AVE over TH 94
Map
Coordinates:
+44.96488, -93.2832844°57'54" N, 93°16'60" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | GROVELAND AVE over TH 94 |
| Structure number: | 27966 |
| Location: | 0.7 MI W OF W JCT TH 35W |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 129.3 ft. [39.4 m] |
| Total length: | 369.1 ft. [112.5 m] |
| Roadway width between curbs: | 40.0 ft. [12.2 m] |
| Deck width edge-to-edge: | 52.2 ft. [15.9 m] |
| Vertical clearance below bridge: | 15.4 ft. [4.7 m] |
| Skew angle: | 50° |
| Owner: | State Highway Agency [01] |
| Year built: | 1965 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 4 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Low slump Concrete [4] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 2,700 [as of 2005] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 65.3 tons [59.4 metric tons] |
| Inventory rating: | 39.2 tons [35.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 96.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,630,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 2,300 [as of 1997] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 64.9 tons [59.0 metric tons] |
| Inventory rating: | 38.8 tons [35.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 84.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 2,475 [as of 1983] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 94.8 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,195,000 |