Share:

TH 55 over MINNEHAHA CREEK

Map 

Coordinates:
+44.91500, -93.21333
44°54'54" N, 93°12'48" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:TH 55 over MINNEHAHA CREEK
Structure number:27X03
Location:2.2 MI NW OF JCT TH 5
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:40.4 ft. [12.3 m]
Total length:41.7 ft. [12.7 m]
Owner:State Highway Agency [01]
Year built:1999
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Main span material:Concrete [1]
Main span design:Culvert [19]
Deck type:Not applicable [N]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,600 [as of 2008]
Truck traffic:4% of total traffic
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Culvert condition:No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:53.9 tons [49.0 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:81.4

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,500 [as of 1996]
Truck traffic:5% of total traffic
Channel protection:There are no noticeable or noteworthy deficiencies which affect the condition of the channel. [9]
Culvert condition:No deficiencies [9]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:53.5 tons [48.6 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:96.3