Facts 

Name:TWP 785 over JUD DITCH # 7
Structure number:34501
Location:0.2 MI W OF JCT CSAH 7
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:23.0 ft. [7.0 m]
Total length:47.9 ft. [14.6 m]
Roadway width between curbs:26.6 ft. [8.1 m]
Deck width edge-to-edge:27.9 ft. [8.5 m]
Owner:County Highway Agency [02]
Year built:1963
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Wood or timber [7]
Main spans design:Slab [01]
Deck type:Wood or Timber [8]
Wearing surface:Gravel [8]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:60 [as of 2002]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:59.3 tons [53.9 metric tons]
Inventory rating:42.0 tons [38.2 metric tons]
Sufficiency rating:97.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$154,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:80 [as of 1998]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:58.9 tons [53.5 metric tons]
Inventory rating:41.7 tons [37.9 metric tons]
Sufficiency rating:98.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:110 [as of 1990]
Truck traffic:1% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:40.8 tons [37.1 metric tons]
Inventory rating:28.5 tons [25.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:69.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$113,000