MSAS 134(10TH ST) over DOBBINS CREEK
Map
Coordinates:
+43.66477, -92.9625343°39'53" N, 92°57'45" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | MSAS 134(10TH ST) over DOBBINS CREEK |
| Structure number: | 5229 |
| Location: | 0.1 MI S OF OAKLAND PL |
| Purpose: | Carries highway and pedestrian walkway over waterway |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 33.1 ft. [10.1 m] |
| Total length: | 100.1 ft. [30.5 m] |
| Roadway width between curbs: | 40.0 ft. [12.2 m] |
| Deck width edge-to-edge: | 55.1 ft. [16.8 m] |
| Owner: | County Highway Agency [02] |
| Year built: | 1932 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 3 |
| Main spans material: | Concrete [1] |
| Main spans design: | Girder and floorbeam system [03] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 2,800 [as of 2008] |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 44.6 tons [40.5 metric tons] |
| Inventory rating: | 25.1 tons [22.8 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 42.1 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $424,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,950 [as of 1996] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 44.2 tons [40.2 metric tons] |
| Inventory rating: | 24.9 tons [22.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 67.2 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,800 [as of 1988] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 37.2 tons [33.8 metric tons] |
| Inventory rating: | 21.0 tons [19.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 68.0 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $185,000 |