Share:

MIDTOWN GREENWAY over DEAN BLVD

Map 

Coordinates:
+44.95000, -93.31500
44°57'00" N, 93°18'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:MIDTOWN GREENWAY over DEAN BLVD
Structure number:90661
Location:0.1 MI N OF LAKE ST
Purpose:Carries railroad over highway
Route classification:Collector (Urban) [17]
Length of largest span:22.0 ft. [6.7 m]
Total length:74.2 ft. [22.6 m]
Year built:1912
Main span material:Concrete [1]
Main span design:Slab [01]

2010 Inspection 

Average daily traffic:7,200 [as of 2008]

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 1992]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Evaluation:Not applicable [N]
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]

1992 Inspection 

Average daily traffic:6,440 [as of 1985]
Truck traffic:1% of total traffic