Share:

I 35W over E 31St St

Map 

Coordinates:
+44.94666, -93.27460
44°56'48" N, 93°16'29" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I 35W over E 31St St
Structure number:9731
Location:1.5 MI S OF JCT TH 94
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:65.9 ft. [20.1 m]
Total length:128.6 ft. [39.2 m]
Roadway width between curbs:135.5 ft. [41.3 m]
Deck width edge-to-edge:141.4 ft. [43.1 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Owner:State Highway Agency [01]
Year built:1965
Year reconstructed:1995
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Main span material:Prestressed concrete [5]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:191,000 [as of 2006]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:79.0 tons [71.8 metric tons]
Inventory rating:52.0 tons [47.3 metric tons]
Sufficiency rating:85.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,735,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:170,000 [as of 1996]
Truck traffic:6% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:78.4 tons [71.3 metric tons]
Inventory rating:51.7 tons [47.0 metric tons]
Sufficiency rating:85.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:172,000 [as of 1990]
Truck traffic:5% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:78.2 tons [71.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:55.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,272,000