Share:

10th AVE S over MIDTOWN GREENWAY

Map 

Coordinates:
+44.95028, -93.26011
44°57'01" N, 93°15'36" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:10th AVE S over MIDTOWN GREENWAY
Structure number:L8915
Location:0.1 MI N OF LAKE ST
Purpose:Carries highway and pedestrian walkway over pedestrian/bicycle trail
Route classification:Local (Urban) [19]
Length of largest span:31.5 ft. [9.6 m]
Total length:114.2 ft. [34.8 m]
Roadway width between curbs:32.2 ft. [9.8 m]
Deck width edge-to-edge:50.9 ft. [15.5 m]
Owner:Railroad [27]
Year built:1915
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Girder and floorbeam system [03]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:3,864 [as of 2007]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:32.3 tons [29.4 metric tons]
Inventory rating:21.6 tons [19.6 metric tons]
Sufficiency rating:61.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$457,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,250 [as of 1985]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:32.1 tons [29.2 metric tons]
Inventory rating:21.3 tons [19.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:59.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,250 [as of 1985]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:31.7 tons [28.8 metric tons]
Inventory rating:20.8 tons [18.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:57.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$335,000