RP IS55N TO TRUMAN over IS 44

Map 

Coordinates:
+38.61024, -90.21043
38°36'37" N, 90°12'38" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RP IS55N TO TRUMAN over IS 44
Structure number:1267
Old structure number:A1542R 1 (from 1992 edition)
Location:S 30 T 47 N R 2 E
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:66.9 ft. [20.4 m]
Total length:166.0 ft. [50.6 m]
Roadway width between curbs:41.0 ft. [12.5 m]
Deck width edge-to-edge:43.6 ft. [13.3 m]
Vertical clearance below bridge:21.7 ft. [6.6 m]
Skew angle:25°
Owner:State Highway Agency [01]
Year built:1970
Year reconstructed:1990
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,500 [as of 2009]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:56.1 tons [51.0 metric tons]
Inventory rating:31.9 tons [29.0 metric tons]
Sufficiency rating:92.7

2000 Inspection 

Average daily traffic:5,300 [as of 1996]
Truck traffic:10% of total traffic
Evaluation:Not applicable [N]
Sufficiency rating:90.5

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,890 [as of 1990]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:85.1 tons [77.4 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Sufficiency rating:92.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$522,000