Share:

LINDELL-UNION over FOREST PARK PKWY

Map 

Coordinates:
+38.64505, -90.27496
38°38'42" N, 90°16'30" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:LINDELL-UNION over FOREST PARK PKWY
Structure number:13487
Old structure number:U387540005 115 (from 1992 edition)
Location:S 18 T 45 N R 7 E
Purpose:Carries highway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:85.0 ft. [25.9 m]
Total length:86.3 ft. [26.3 m]
Roadway width between curbs:123.0 ft. [37.5 m]
Deck width edge-to-edge:338.9 ft. [103.3 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Skew angle:46°
Owner:City or Municipal Highway Agency [04]
Year built:1961
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Main span material:Concrete continuous [2]
Main span design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:33,500 [as of 2009]
Truck traffic:5% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:37.6 tons [34.2 metric tons]
Inventory rating:25.7 tons [23.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:51.1
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,323,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:33,000 [as of 1998]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:37.6 tons [34.2 metric tons]
Inventory rating:25.7 tons [23.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:59.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,260,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:43,000 [as of 1989]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:37.6 tons [34.2 metric tons]
Inventory rating:25.7 tons [23.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:59.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$677,000