LINDELL-UNION over FOREST PARK PKWY
Map
Coordinates:
+38.64505, -90.2749638°38'42" N, 90°16'30" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | LINDELL-UNION over FOREST PARK PKWY |
| Structure number: | 13487 |
| Old structure number: | U387540005 115 (from 1992 edition) |
| Location: | S 18 T 45 N R 7 E |
| Purpose: | Carries highway over highway |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 85.0 ft. [25.9 m] |
| Total length: | 86.3 ft. [26.3 m] |
| Roadway width between curbs: | 123.0 ft. [37.5 m] |
| Deck width edge-to-edge: | 338.9 ft. [103.3 m] |
| Vertical clearance below bridge: | 13.1 ft. [4.0 m] |
| Skew angle: | 46° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1961 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 18 / H 20 [4] |
| Main span material: | Concrete continuous [2] |
| Main span design: | Slab [01] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 33,500 [as of 2009] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 37.6 tons [34.2 metric tons] |
| Inventory rating: | 25.7 tons [23.4 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 51.1 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $1,323,000 |
2000 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 33,000 [as of 1998] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 37.6 tons [34.2 metric tons] |
| Inventory rating: | 25.7 tons [23.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 59.2 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,260,000 |
1992 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 43,000 [as of 1989] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 37.6 tons [34.2 metric tons] |
| Inventory rating: | 25.7 tons [23.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 59.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $677,000 |