172ND ST over NEW HOPE CR

Map 

Coordinates:
+39.40439, -94.34500
39°24'16" N, 94°20'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:172ND ST over NEW HOPE CR
Structure number:13850
Old structure number:0490016 024 (from 1992 edition)
Location:S 14 T 53 N R 31 W
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:43.0 ft. [13.1 m]
Total length:103.0 ft. [31.4 m]
Roadway width between curbs:15.7 ft. [4.8 m]
Deck width edge-to-edge:17.4 ft. [5.3 m]
Owner:County Highway Agency [02]
Year built:1919
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Arch - Deck [11]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:109 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:25.7 tons [23.4 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:50.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$296,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:125 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:25.7 tons [23.4 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:60.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$177,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:120 [as of 1988]
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:25.7 tons [23.4 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:63.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$269,000