172ND ST over NEW HOPE CR
Map
Coordinates:
+39.40439, -94.3450039°24'16" N, 94°20'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | 172ND ST over NEW HOPE CR |
| Structure number: | 13850 |
| Old structure number: | 0490016 024 (from 1992 edition) |
| Location: | S 14 T 53 N R 31 W |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Rural) [09] |
| Length of largest span: | 43.0 ft. [13.1 m] |
| Total length: | 103.0 ft. [31.4 m] |
| Roadway width between curbs: | 15.7 ft. [4.8 m] |
| Deck width edge-to-edge: | 17.4 ft. [5.3 m] |
| Owner: | County Highway Agency [02] |
| Year built: | 1919 |
| Historic significance: | Bridge is eligible for the National Register of Historic Places [2] |
| Number of main spans: | 2 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Arch - Deck [11] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 109 [as of 2008] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 25.7 tons [23.4 metric tons] |
| Inventory rating: | 18.8 tons [17.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 50.7 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $296,000 |
2000 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 125 [as of 1998] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 25.7 tons [23.4 metric tons] |
| Inventory rating: | 18.8 tons [17.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 60.7 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $177,000 |
1992 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 120 [as of 1988] |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 25.7 tons [23.4 metric tons] |
| Inventory rating: | 18.8 tons [17.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 63.2 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $269,000 |