IMPERIAL ST over RICHLAND CR

Map 

Coordinates:
+39.96157, -92.53567
39°57'42" N, 92°32'08" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:IMPERIAL ST over RICHLAND CR
Structure number:14308
Old structure number:063R009 061 (from 1992 edition)
Location:S 35 T 60 N R 15 W
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:35.1 ft. [10.7 m]
Total length:36.1 ft. [11.0 m]
Roadway width between curbs:16.1 ft. [4.9 m]
Deck width edge-to-edge:16.1 ft. [4.9 m]
Owner:County Highway Agency [02]
Year reconstructed:1989
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:5 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:19.8 tons [18.0 metric tons]
Inventory rating:12.9 tons [11.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:44.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$196,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:5 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:19.8 tons [18.0 metric tons]
Inventory rating:12.9 tons [11.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:44.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$96,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:5 [as of 1988]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:19.8 tons [18.0 metric tons]
Inventory rating:12.9 tons [11.7 metric tons]
Sufficiency rating:51.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$95,000