LANDMARK ST over TRIB TO BEAR CR
Map
Coordinates:
+39.93917, -92.3858539°56'21" N, 92°23'09" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | LANDMARK ST over TRIB TO BEAR CR |
| Structure number: | 17010 |
| Old structure number: | 13900191 061 (from 1992 edition) |
| Location: | S 7 T 59 N R 13 W |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Rural) [09] |
| Length of largest span: | 51.8 ft. [15.8 m] |
| Total length: | 53.2 ft. [16.2 m] |
| Roadway width between curbs: | 17.7 ft. [5.4 m] |
| Deck width edge-to-edge: | 18.0 ft. [5.5 m] |
| Owner: | County Highway Agency [02] |
| Year built: | 1998 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Steel [3] |
| Main span design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 30 [as of 2008] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Inventory rating: | 67.3 tons [61.2 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 93.7 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 30 [as of 1998] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Excellent [9 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Inventory rating: | 67.3 tons [61.2 metric tons] |
| Sufficiency rating: | 95.0 |