Facts 

Name:IS 29 N over CST TIFFANY SPRINGS PKWY
Structure number:1970
Old structure number:A2283R 3 (from 1992 edition)
Location:S 36 T 52 N R 34 W
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:54.1 ft. [16.5 m]
Total length:183.1 ft. [55.8 m]
Roadway width between curbs:48.9 ft. [14.9 m]
Deck width edge-to-edge:51.8 ft. [15.8 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Owner:State Highway Agency [01]
Year built:1968
Year reconstructed:1985
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:29,553 [as of 2009]
Truck traffic:18% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:56.1 tons [51.0 metric tons]
Inventory rating:35.2 tons [32.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:90.4

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:28,759 [as of 1997]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:91.2

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:22,352 [as of 1991]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:90.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$851,000