Share:

JAMIESON AVE N over IS 44

Map 

Coordinates:
+38.60574, -90.30734
38°36'21" N, 90°18'26" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:JAMIESON AVE N over IS 44
Structure number:2001
Old structure number:A2317R 3 (from 1992 edition)
Location:S 26 T 45 N R 6 E
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:112.9 ft. [34.4 m]
Total length:326.1 ft. [99.4 m]
Roadway width between curbs:36.4 ft. [11.1 m]
Deck width edge-to-edge:44.0 ft. [13.4 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Skew angle:49°
Owner:State Highway Agency [01]
Year built:1971
Year reconstructed:1984
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:5,446 [as of 2009]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:53.9 tons [49.0 metric tons]
Inventory rating:34.1 tons [31.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:71.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,730,000

2000 Inspection 

Average daily traffic:37,000 [as of 1996]
Truck traffic:10% of total traffic
Evaluation:Not applicable [N]
Sufficiency rating:82.8

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:11,030 [as of 1990]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:68.3 tons [62.1 metric tons]
Inventory rating:33.7 tons [30.6 metric tons]
Sufficiency rating:93.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$856,000