Facts 

Name:IS 44 W over CST SOUTHWEST AVE
Structure number:2003
Old structure number:A2318R 3 (from 1992 edition)
Location:S 25 T 45 N R 6 E
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:66.9 ft. [20.4 m]
Total length:183.1 ft. [55.8 m]
Roadway width between curbs:65.6 ft. [20.0 m]
Deck width edge-to-edge:68.2 ft. [20.8 m]
Vertical clearance below bridge:14.4 ft. [4.4 m]
Skew angle:15°
Owner:State Highway Agency [01]
Year built:1971
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:61,136 [as of 2009]
Truck traffic:11% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:81.4 tons [74.0 metric tons]
Inventory rating:49.5 tons [45.0 metric tons]
Sufficiency rating:94.1

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:45,101 [as of 1997]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:41.6 tons [37.8 metric tons]
Sufficiency rating:92.7

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:41,233 [as of 1991]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:31.7 tons [28.8 metric tons]
Sufficiency rating:91.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,032,000