GRAPEVINE ST over SWEEZER CR
Map
Coordinates:
+39.81471, -92.6062539°48'53" N, 92°36'23" W
Source: National Bridge Inventory (1992, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | GRAPEVINE ST over SWEEZER CR |
| Structure number: | 21243 |
| Old structure number: | 297R007 061 (from 1992 edition) |
| Location: | S 20 T 58 N R 15 W |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Rural) [09] |
| Length of largest span: | 45.9 ft. [14.0 m] |
| Total length: | 46.9 ft. [14.3 m] |
| Roadway width between curbs: | 15.7 ft. [4.8 m] |
| Deck width edge-to-edge: | 15.7 ft. [4.8 m] |
| Owner: | County Highway Agency [02] |
| Year built: | 1910 |
| Year reconstructed: | 1989 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Main span material: | Steel [3] |
| Main span design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 15 [as of 2008] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 18.8 tons [17.1 metric tons] |
| Inventory rating: | 10.9 tons [9.9 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 52.5 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $156,000 |
1992 Inspection
| Status: | Open, posting recommended but not legally implemented [B] |
| Average daily traffic: | 15 [as of 1990] |
| Deck condition: | Excellent [9 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 22.8 tons [20.7 metric tons] |
| Inventory rating: | 10.9 tons [9.9 metric tons] |
| Sufficiency rating: | 47.6 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $122,000 |