Share:

3RD ST over THOMPSON RVR

Map 

Coordinates:
+40.07966, -93.64389
40°04'47" N, 93°38'38" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:3RD ST over THOMPSON RVR
Structure number:23233
Old structure number:3970008 040 (from 1992 edition)
Location:S 18 T 61 N R 24 W
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:120.1 ft. [36.6 m]
Total length:303.2 ft. [92.4 m]
Roadway width between curbs:18.0 ft. [5.5 m]
Deck width edge-to-edge:18.4 ft. [5.6 m]
Vertical clearance above deck:14.4 ft. [4.4 m]
Owner:County Highway Agency [02]
Year built:1921
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:100 [as of 2010]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:14.9 tons [13.5 metric tons]
Inventory rating:7.9 tons [7.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:31.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,115,000

2000 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:100 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Serious [3 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:14.9 tons [13.5 metric tons]
Inventory rating:7.9 tons [7.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:34.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$572,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:100 [as of 1988]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Operating rating:14.9 tons [13.5 metric tons]
Inventory rating:7.9 tons [7.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:43.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$899,000